On SMP 7.1 SP2, Start Dates are automatically synchronized when creating a Shared Schedule with Multiple Schedules.  In other words, the UI lets you set different start dates for each of your schedules in a shared schedule but after saving, it makes all start dates the same.  I'm able to create shared schedules with multiple schedules that have different start dates in Altiris 6 so don't know why there was a regression in this feature going forward to SMP 7.1.