I need a solution
Hi Guys,
We have a current deployment of SEP from one of our clients using SNAC 11.0.6
Here is what we have done so far:
1. Created a virtual machine similar to their production environment.
2. On the VM, we installed 11.0.6 SNAC SEPM and then used replication from their production SNAC.
3. After replication, we upgraded the VM with the 12.1 RU2 SEP and SNAC version.
Here is my dilemma,
I deployed a package to 5 workstations with SEP/SNAC and was successfully installed.
But the problem is, they did not report to the new server but instead connected to the production server.
Is that because the sylink I used from the new server was a replicate of the sylink from the production server?
Or I need to turn my replication off?